REMOVAL & DISPOSAL OF AN AERIAL PIPELINE CROSSING
| Owner: |
Terasen |
| Value: |
$600,000.00 |
| Description: |
The work involved removing an aerial pipeline that crossed the Columbia River in Castleger BC complete with pipeline, towers, suspension cables and concrete foundations and anchors. |
| Location: |
Castlegar, BC |
The project involved the removal of an obsolete pipeline over 1000’ long and suspended between two towers over a very sensitive river without touching the water. This posed a large number of technical difficulties but Johnston Construction was up to the challenge.
A leading BC Bridge Engineering Firm was brought onboard to work closely with Johnston Construction’s experienced in-house Project Management team and technical staff to prepare a detailed work plan. This work plan addressed all the technical challenges of the project while still maintaining the tight timeline and adhering to a strict environmental policy.
The work plan involved four major phases:
- The removal of the gas line from the suspension structure
- The removal of the suspension wires that spanned the Columbia River and had supported the gas line.
- Removal of the suspension towers, wind brace towers, guy lines and all associated anchors and foundations located on the banks of the river.
- Site cleanup and revegetation
Through close cooperation with the Owner’s team of professionals this unique and challenging project was completed to the satisfaction of everyone involved in a timely and cost effective manner.